五月激情婷婷综合_亚洲成熟女二三区_美国一级片网站_黄色真人一级毛片_亚洲欧美人成综合在线视频_日韩国产高清无码_日韩精品激情中文一区_黄色片国产视频网站_亚洲精品在线免费高清不卡_午夜免费啪视频在线观看区

全國(guó)服務(wù)熱線:18631165157
網(wǎng)站公告:
誠(chéng)信換來(lái)金招牌 服務(wù)贏得天下客...
聯(lián)系我們
18631165157
地址:
安國(guó)市南陽(yáng)工業(yè)區(qū)
郵箱:
415130881@qq.com
電話:
18631165157
傳真:
0312-3427286
手機(jī):
18631165157
公司新聞 News
PWDL多吸頭排污泵安裝注意事項(xiàng)
添加時(shí)間:2023.08.28

1. 安裝前準(zhǔn)備:在安裝多吸頭排污泵之前,需要對(duì)設(shè)備進(jìn)行檢查,確保設(shè)備完好無(wú)損,各部件齊全。同時(shí),還需要準(zhǔn)備好所需的工具和材料,如螺絲刀、扳手、電鉆、螺栓等。

2. 選擇合適的安裝位置:多吸頭排污泵應(yīng)安裝在通風(fēng)良好、排水方便的地方,避免陽(yáng)光直射和潮濕環(huán)境。同時(shí),應(yīng)確保泵體與地面的水平距離不小于30cm,以保證泵的正常運(yùn)行。

3. 固定泵體:使用膨脹螺栓將泵體固定在地面上,注意不要損壞墻體或地面。在固定泵體時(shí),應(yīng)確保泵體的水平度。

4. 連接電纜:將電纜從電源處接到多吸頭排污泵的接線盒上,注意接線要牢固可靠。同時(shí),還應(yīng)設(shè)置接地線,以防止漏電事故的發(fā)生。

5. 連接管道:將多吸頭排污泵與管道連接,注意管道的密封性和耐壓性。在連接過(guò)程中,可以使用密封膠或螺栓進(jìn)行固定。

6. 檢查密封性:在安裝完成后,應(yīng)檢查多吸頭排污泵的密封性能,確保無(wú)泄漏現(xiàn)象??梢酝ㄟ^(guò)向管道內(nèi)充水來(lái)檢查泵的密封性能。

7. 試運(yùn)行:在完成以上步驟后,可以進(jìn)行試運(yùn)行。首先打開(kāi)電源開(kāi)關(guān),然后打開(kāi)水源閥門,觀察多吸頭排污泵的工作情況。如果發(fā)現(xiàn)異?,F(xiàn)象,應(yīng)及時(shí)停機(jī)檢查原因并排除故障。

8. 定期維護(hù):多吸頭排污泵在使用過(guò)程中,應(yīng)定期進(jìn)行維護(hù)保養(yǎng),包括清潔泵體、更換濾網(wǎng)、檢查電機(jī)等。這樣可以延長(zhǎng)設(shè)備的使用壽命,保證其正常運(yùn)行。

1. Preparation before installation: Before installing the multi suction sewage pump, it is necessary to inspect the equipment to ensure that it is intact and all components are complete. At the same time, it is also necessary to prepare the necessary tools and materials, such as screwdrivers, wrenches, electric drills, bolts, etc.

2. Choose a suitable installation location: The multi suction sewage pump should be installed in a well ventilated and convenient drainage area, avoiding direct sunlight and humid environments. At the same time, it should be ensured that the horizontal distance between the pump body and the ground is not less than 30cm to ensure the normal operation of the pump.

3. Fix the pump body: Use expansion bolts to fix the pump body on the ground, taking care not to damage the wall or ground. When fixing the pump body, ensure the levelness of the pump body.

4. Connection cable: Connect the cable from the power source to the junction box of the multi suction sewage pump, and ensure that the wiring is firm and reliable. At the same time, grounding wires should also be installed to prevent leakage accidents.

5. Connecting the pipeline: Connect the multi suction sewage pump to the pipeline, paying attention to the sealing and pressure resistance of the pipeline. During the connection process, sealant or bolts can be used for fixation.

6. Check the sealing performance: After installation, the sealing performance of the multi suction sewage pump should be checked to ensure no leakage. The sealing performance of the pump can be checked by filling the pipeline with water.

7. Trial operation: After completing the above steps, the trial operation can be carried out. Firstly, turn on the power switch, then open the water source valve and observe the operation of the multi suction sewage pump. If abnormal phenomena are found, the machine should be shut down in a timely manner to check the cause and eliminate the fault.

8. Regular maintenance: During the use of the multi suction sewage pump, regular maintenance should be carried out, including cleaning the pump body, replacing the filter screen, and inspecting the motor. This can extend the service life of the equipment and ensure its normal operation.